Editing Meeting-20101120

Jump to: navigation, search

Warning: You are not logged in.

Your IP address will be recorded in this page's edit history.
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Latest revision Your text
Line 30: Line 30:
 
A wired network will be provided for those who are installing or configuring free and open source software.  Wireless internet will also be available in the auditorium.
 
A wired network will be provided for those who are installing or configuring free and open source software.  Wireless internet will also be available in the auditorium.
  
Show up sooner rather than later allow yourself enough time to accomplish a complete install. The last install will start at 2:30 P.M.  We will be closing down the network and cleaning up starting at 4:00 P.M. so we can be out of the building by 4:30 P.M.
+
Show up sooner rather than later allow yourself enough time to accomplish a complete install. The last install will start at 2:30 P.M.  We will be closing down the network and cleaning up starting at 4:30 P.M. so we can be out of the building by 5 P.M.
  
 
If you are bringing bulky/heavy hardware, pull your car into the school driveway and drive around the back to the basketball court.  There is an access ramp there leading to the auditorium.  This area is for '''loading and unloading only''', so move your car back to a legal parking space on the street once you've gotten your stuff in the building.
 
If you are bringing bulky/heavy hardware, pull your car into the school driveway and drive around the back to the basketball court.  There is an access ramp there leading to the auditorium.  This area is for '''loading and unloading only''', so move your car back to a legal parking space on the street once you've gotten your stuff in the building.
Line 57: Line 57:
 
== How to help - Sign up here ==
 
== How to help - Sign up here ==
  
LAN setup - move equipment into the building, turn on switches, deploy power and ethernet cables in a responsible manner starting 1:30 P.M. or as soon as we can get into the building.
+
LAN setup - move equipment into the building, turn on switches, deploy power and ethernet cables in a responsible manner starting 12 P.M. or as soon as we can get into the building.
  
 
* Your name here
 
* Your name here
  
LAN cleanup - turn off switches and pack up WPLUG equipment. All people and stuff must be out of the building by 4:30 P.M. '''sharp.'''
+
LAN cleanup - turn off switches and pack up WPLUG equipment. All people and stuff must be out of the building by 5 P.M. '''sharp.'''
  
 
* [[User:Vance|Vance Kochenderfer]]
 
* [[User:Vance|Vance Kochenderfer]]

Please note that all contributions to WPLUG may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see WPLUG:Copyrights for details). Do not submit copyrighted work without permission!

Cancel | Editing help (opens in new window)