Editing Meeting-20111203
Warning: You are not logged in.
Your IP address will be recorded in this page's edit history.The edit can be undone.
Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 46: | Line 46: | ||
== How to help - Sign up here == | == How to help - Sign up here == | ||
− | LAN setup - move equipment into the building, turn on switches, deploy power and ethernet cables in a responsible manner starting | + | LAN setup - move equipment into the building, turn on switches, deploy power and ethernet cables in a responsible manner starting 9:00am or as soon as we can get into the building. |
* Your name here | * Your name here | ||
* Your name here | * Your name here | ||
− | LAN cleanup - turn off switches and pack up WPLUG equipment. All people and stuff must be out of the building by | + | LAN cleanup - turn off switches and pack up WPLUG equipment. All people and stuff must be out of the building by 2:30pm '''sharp.''' |
* Your name here | * Your name here |